If you own a Victorian, Edwardian or Georgian property in London and you are planning restoration work, the first question is nearly always the same: what is this going to cost? Honest answer: it depends on the house — but “it depends” is no use when you are budgeting. So here are the real-world ranges we quote against every week at Heritage Construction, what pushes a job to the top or bottom of each range, and how to budget without nasty surprises.
All figures are indicative 2026 prices for London, excluding VAT — and London only. Every period property is different: treat these as planning numbers, then get a proper itemised estimate before committing.
First, a warning: London is its own price bubble
If you have been reading national cost guides, put their numbers down — London restoration prices typically run 30–50% above national averages, and for specialist heritage trades the gap can be wider still. Skilled labour costs more here and there is less of it to go round; parking, congestion and ULEZ charges hit every van and delivery; scaffold and skip licences cost more on London streets; and the sheer concentration of period housing means the best lime plasterers and sash specialists are booked out. A guide price that looks right for Manchester or Leeds is a fantasy in Richmond or Clapham — every figure below is a London number.
What drives the price of period property work
- Access and condition: a sound wall re-rendered is one price; hacking off failed cement, letting brick dry and rebuilding decayed sections is another.
- Materials: lime plaster, handmade bricks and matching joinery cost more than modern equivalents — but they are why the work lasts.
- Consents: conservation-area rules and listed-building consent add specification (and sometimes waiting time), not just paperwork.
- How much of the house is involved: scaffold, welfare and project management spread across a bigger job — which is why whole-house rates per square metre fall as scope grows.
Typical costs by job
Lime plastering and render
- Internal lime re-plastering: roughly £100–£165 per m² depending on backing condition and finish
- External lime render (hack off cement, re-render): £130–£220 per m² including scaffold on a typical terrace elevation
- Lime repointing brickwork: £75–£130 per m²
Sash window restoration
- Overhaul and draught-proofing (cords, weights, seals): £350–£650 per window
- Full restoration with splice repairs and redecoration: £800–£1,500 per window
- Like-for-like replacement sash (conservation-approved): £1,800–£3,000+
Cornicing, joinery and detail
- Running new cornice to match original: £100–£200 per linear metre
- Ceiling rose repair or replacement: £150–£450
- Bespoke joinery (shutters, panelling, doors): quoted per piece — as a guide, a restored four-panel door with furniture lands around £600–£1,200
Sympathetic services upgrades
- Rewiring a 3-bed period house with minimal fabric damage: £9,000–£16,000
- New heating with discreet pipe runs: £8,000–£16,000
Whole-house restoration
- Full refurbishment of a period property: £1,800–£2,800 per m² depending on specification — a typical 4-bed Victorian terrace lands in the £250k–£450k band including a kitchen, bathrooms and decoration
Want a real number for your house? Guide prices only go so far — every period property is different. We provide free, itemised estimates with every element priced separately, so you can see exactly where the money goes.
Call 020 7117 2075 or send us your plans — no obligation.
The conservation-area and listed-building premium
Budget roughly 10–25% extra where consent applies. It buys approved materials, methodical work and documentation — and it protects the value of the house. Skipping it is the expensive option: unauthorised work on a listed building can mean being ordered to undo it.
Why the cheapest quote usually costs the most
Most of the expensive problems we fix were caused by earlier “savings”: cement render on solid walls (trapped damp — see our guide to lime plaster vs cement), gypsum over damp brick, uPVC in conservation streets that had to come out again. A quote that is 30% below the others is usually missing scope, using the wrong materials, or both. Compare quotes on itemisation, materials and who actually does the work — not the bottom line alone.
How to budget a restoration project
- Survey first: know what the house needs before fixing a number.
- Stage the work: fabric first (roof, damp, windows), finishes second — a good builder will phase it with you.
- Hold a 10–15% contingency: period houses keep secrets behind plaster.
- Get an itemised estimate: if you cannot see what each element costs, you cannot compare or trim it.
Get a real number for your house
Heritage Construction carries out period property restoration and sash window restoration across Richmond, Twickenham, Kingston, Wandsworth, Clapham and south-west London — rated 10/10 on Checkatrade, with transparent day and hourly rates. Send us your plans or book a survey: call 020 7117 2075 or get in touch for a free itemised estimate.